Repairs & Remodeling since December of 2023
12/2023 – New Guttering
3/2024 – Outside windows and doors sanded, caulked & painted
4/2024 – First Outdoor Flagpole – Concrete Pad
4/2024 – Power washed front of Library
10/2024 – Removed flat roof, installed new sheeting and roof over children’s room
10/2024 – Installed new 2nd story guttering
2/2025 – Children’s room walls patched, sealed and painted
4/2025 – South sidewalk removed and replaced
4/2025 – Installed new sub-floor and carpet tiles in main Library
4/2025 – Updated all network cabling
4/2025 – Remodeled main Library with new partial wall and relocated bookshelves
4/2025 – Water line and drain repair
4/2025 – Restored and refinished original front desk, pony wall finishing and windowsill repairs
6/2025 – Stabilized front concrete steps, resealed stairs and sidewalls
8/2025 – Tuckpoint on south side of building
8/2025 – Installed new metal roof
1/2026 – Replaced lightbulbs in the ceiling fixtures
Spring 2026 – Repair soffit on North and East side of building
