Repairs & Remodeling since December of 2023

12/2023 – New Guttering

3/2024 – Outside windows and doors sanded, caulked & painted

4/2024 – First Outdoor Flagpole – Concrete Pad

4/2024 – Power washed front of Library

10/2024 – Removed flat roof, installed new sheeting and roof over children’s room

10/2024 – Installed new 2nd story guttering

2/2025 – Children’s room walls patched, sealed and painted

4/2025 – South sidewalk removed and replaced

4/2025 – Installed new sub-floor and carpet tiles in main Library

4/2025 – Updated all network cabling

4/2025 – Remodeled main Library with new partial wall and relocated bookshelves

4/2025 – Water line and drain repair

4/2025 – Restored and refinished original front desk, pony wall finishing and windowsill repairs

6/2025 – Stabilized front concrete steps, resealed stairs and sidewalls

8/2025 – Tuckpoint on south side of building

8/2025 – Installed new metal roof

1/2026 – Replaced lightbulbs in the ceiling fixtures

Spring 2026 – Repair soffit on North and East side of building